The challenge
A high-voltage connection design contains assumptions about current load, short-circuit withstand, thermal behaviour and mechanical forces. Errors only come to light during operation — with failure risk and costs as a result.
Our approach
Nexums independently assesses your connection design: from clamp and busbar configuration to interfaces and material selection. We advise on which verifications are needed, verify the assumptions and review the calculations carried out by your engineering firm.
Standards framework
IEC 61284 · IEC 62271 · IEC 60865
Result
An independent review report with findings, risks and concrete recommendations — before the design goes into execution.
FAQ
What is a connection design review?
An assessment of the connection design against IEC 61284 and IEC 60865 to ensure that clamps, busbar joints or flexible conductors are correctly dimensioned and executed.
When do I need a design review?
When designing new high-voltage installations, when modifying existing connections, or when in doubt about applying standard components in a specific situation.
How long does a review take?
A standard design review takes 2–5 working days, depending on the scope and available documentation.
Need independent advisory on connection design review?